Sorry for the lack of updates, but been working on a few other projects, but I have finally got it built and taken it for it’s first test ride!
But firstly I had to replace the crushed tube, I tried to maintain as much of the good tube as possible, but ended up removing most of the straight section of the downtube as I wasn’t 100% happy with it.
Adding the final layers of carbon went without any major problems.
I have also added a direct mount for a front derailleur.
It’s done!* I’ve been for a quick test ride and everything performed as expected and it is suitably stiff without being overly harsh. I’m looking forward to having so time to get out and do some longer rides once I have a shorter stem. I have also booked my flight to Geneva ready to do the GR5 (or a similar alpine route) on it!
*I’m still on the hunt for a lightweight black 90mm standard clamp (25.4mm) stem as the only one I had lying around is 120mm, so if anyone has one I’d be happy to buy it off you!