you need to check you can actually soak away first..
Dig a hole, measure it and fill it with water, time how quickly it soaks away and you can tailor your soakaway to suit. If you have a heavy clay then you’ll need a larger soakaway to attenuate the water, gravels, you can skimp on size a bit.
There are loads of online calculators and guidance, e.g.;
http://www.horsham.gov.uk/environment/8408.aspx
but I recommend you spend an hour doing a test first, I used to design the things and the ground conditions make a big difference, you don’t want to dig a bigger hole than you need.
Best of luck