Who’s in charge? well I am sort of, site is owned by LCC and I’m the countryside officer (working for LCC) for the area and I have developing mountain bike routes in my job description. Lee Quarry is the main mountainbiking project I’m working on at the moment. So far we have built about 4.5k of trails designed by Dafydd Davis mostly red with a bit of black. Also worked with local trials riders to put in some cycletrials areas. Next phase of building is due to start second week in Feb, this time we have hired Rowan Sorrell to build some trails for us. He’ll be on site for about six weeks adding a “missing” section of the red route some black graded features and some passing places on the lower section of the red. Oh and an additional trials section. We also have an artist Robin Dobson who is going to build a “ridable” sculpture on the site althought I think it will only be ridable by those with considerable trials skills.
In addition to the imediate construction work we are getting designs put together for a link over the moors to Rooley Moor Road, a link to Facit and a link up to the limers gate bw. These will be multi user links. Tied in to these we are getting designs put together for a network of singletrack trails in Facit quarry, Cragg quarry and Land gate and Moss Quarries. Idea is to have 5 quarries (Lee Quarry being the first)each with mountain bike trails linked by a decent bridleway network. This will provide a huge range of riding options in the area and should cater for a wide range of different abilities. Rowan is putting the designs together for us so they should be pretty exciting. Look his stuff up on the web if you want to get a better idea of what he does. All these plans will be subject to public consultation and getting the funding so will take a bit of time but Lee Quarry has given us a boost as it has proved the idea works and so it helps us to persuade people to invest the funds.
Supporting events like the xc racing being organised in the quarry by big and daft and the event we are doing with Singletrack in July will help as well.
Need any more information just ask me or pop in to Ride On and ask Craig he’s been helping us develop the trails.