I’m surprised there wasn’t a lot more rebar and mesh in there, when we’ve removed vaults in the past they are normally riddled with the stuff along with drop bars which do exactly as they say on the tin.
We have a fleet of DD350/500s and recently trialled the new 350 which comes with an auto feed. Drilling 350 diameter in flint concrete with rebar it was taking under 5 minutes to a depth of 500mm. Basically with the new model you whack the rig on the wall, press start and it does the rest itself.
Would have been more impressed if they had rocked up with a Brokk 160.