right, sorry guys. Id hoped to wait till Id got some better photos done, but to keep Tiger happy here’s some from the middle of last week. It’s been nice clean work, with the wood stove going, bottle of beer and 6music on the shelf.
I went to pick up the bulkhead finally on Saturday. 6hr round trip….and in the end one of the cill/b pillar members had to be left behind for reworking as it had come a cropper somewhere along the line and got itself crushed at one end. Fortunately there’s plenty I can get on with without it for now, and Ive been promised the last part by christmas and they will meet me half way at Swindon to hand it over.
I’ll say it now though, it was not a cheap thing to have done, but Im glad I did. The cills and b pillar were actually more expensive than the bulkhead. A new bulkhead is pretty hard to get hold of if at all, so given the extent of the refurb that was needed and the dipping as well, I guess Im happy with the expense.
It’s come out well. All new foot wells, a-pillar tops and bottoms. Shot blasted, jigged, dipped and then tapped or new rivnuts installed. The cills have whole new cill sections welded on the existing b pillars. Again jigged and dipped and the O/S one went on pretty easily so they’re fairly straight then.
Ive refitted the tub uppers over the cappings, the tub lowers to the cills, and have finished fitting the second row seating floor, the new rear seat box that Ive fabricated, the driver’s side floor and the transmission tunnel. The windscreen went on fine too.
It’s all going to need the roof to hold everything together though as it will take some persuading to get everything lined up properly. I shall finish off doing coachwork this week – refitting rear seats, passenger side floor, etc and then get going in the engine bay on the hydraulic systems before the fiddly stuff with the electrics.
Im thinking end of January hopefully, but maybe feb.