MegaSack DRAW - This year's winner is user - rgwb
We will be in touch
Topic starter
We have a combi boiler, before new flooring goes down we were thinking of having a radiator moved further along a wall so we can utilise the wall space.
We'd provide a new vertical rad
Floorboards are already exposed so pipe work is easy to get at.
Rough estimate?? London tax I presume !
Had one quote which was £450 not including the rad !
Doesn't sound right at all.
Time ??
Thanks in advance
Posted : 07/12/2015 12:36 pm
Sounds high. It's easy enough to do yourself (especially as the floor boards are up).
But if you have to pay someone, it'd be a single day job at the absolute tops plus a few quid for joints, pipe etc.
Posted : 07/12/2015 12:40 pm
