• This topic is empty.
Viewing 1 post (of 1 total)
  • Trail build video (Croft Trail in Swindon)
  • tomstickland
    Free Member

    If you ever wonder what goes into trail building, well, it’s mainly a load of graft.
    I’ve just been back through a load of files I had from Oct 2010 through to March 2011. In 6 months we surfaced 1.4km of trail, which is something like 140 tonnes of material shifted, all of it shovelled by hand. I’ve compiled it into a video.

    We’ll have our new loop open by the start of April. It’s just under 1 km with two new bridges, a few rock features and 60m of raised woodwork in the middle.

    Trail build updates here: http://www.mbswindon.co.uk/category/croft-diary/

Viewing 1 post (of 1 total)

The topic ‘Trail build video (Croft Trail in Swindon)’ is closed to new replies.