Hi Bear & meeeee, I’m in exactly the same boat as meeeee!! My Worcester Bosch boiler is 14years old and costing £1,700 a year to feed with oil. The house which is in North Wales, has been extended about 4 years ago, and we added an extra bedroom and living space. I’ve insulation all the roof space with 200mm plus of insulation which has made a difference and started draft proofing. All the windows are new, double glazed with argon gass.
The mains gas is about half a mile away and the price is only going one way. I’ve had the house assessed by a local firm who suggested a 25kw Tundra model or an outdoor WES model; have you any experience of the models Bear?
I have room in the garage for the boiler and enough room outside to store the pellets ( with a bit of a alteration). My main approach to this is as follows;
Applied for the RHPP – which I got on March the 3rd, but it’s only valid until 1 off April!!
Applied for the Green Deal – still not available!!
Waiting for the RHI to be finalised – just been told today by an architect friend of mine that it’s been pushed back until Oct 2013!!!
My main questions are:
Do I change now to pellet?
Which model?
Would a buffer tank or heat exchanger be better?
Hope you can help.
Cheers
Huw