MegaSack DRAW - This year's winner is user - rgwb
We will be in touch
Topic starter
I'm cleaning and re-levelling some garden edging. Do I leave a specified gap between them and the adjacent pavers or do I try and get them as close to the pavers as possible?
I'm thinking a gap of 10 or 20 mm which I'll fill in with sand then jointing compound.
Thanks
Posted : 22/08/2023 1:28 pm
I’d say flush as you can. The edger is to stop the pavers moving.
My latest project;

Posted : 22/08/2023 2:32 pm
Topic starter
Thanks. Your project looks very professional!
Mine are more paving slabs but I guess it still makes sense to get flush. Thanks.
Posted : 22/08/2023 3:18 pm
