@wingnuts, can’t get pics until new years day, no daylight when i get home. But i suspect the temp repair will hide the problem quite well.
As for the comment about lead working, i can bodge it, i don’t really want to pay someone to bodge it!
From bruneeps link, thanks, it looks like the following needs to be done, chase a single grove across the wall to 25mm, rather than the multiple lines at 10mm, then apply 3? lengths of lead flashing, across the length. The only area i am not so sure about is how the flashings are terminated.
My flat roof is bordered by two different flat roofs on one side, grp and a bit higher than mine, it also overhangs my roof by a few inches. The other side is felt, the gap between the two has a brick wall with some poor lead underneath held in place with copping stones over the top.
Ideal solution is to strip the felt, check out the state of the deck, then add a slight pitch, kingspan/celotex/etc and put a membrane over the lot. and get all the beadwork done properly, Costs money though.
Done steel flashings and the like in a previous job, so have some idea of how to work with metal, also know i don’t have the kit.