<p>Right, got you now. Yeah I guess, unless of course they sell it along with any liabilities as SSEB and CEGB did. Not sure why it's newsworthy to be honest as it's always effectively been the case, the difference with the Magnox stations being that they were decommissioned after privatisation and the contract went to tender. In the case of the AGR fleet and SZB they were sold with the liabilities meaning EDF are on the hook for defuelling and decommissioning unless the government feel another party can do it better.</p>


 
Posted : 10/08/2018 2:29 pm
Posts: 44799
Full Member
 

Mike - because you keep trying to hammer me on how I would cover future shortfall but when I put the same question to you I got a wishful thinking answer " In an ideal world more nuclear"

If you want to hammer me on specifics then you need to be specific as well and we are not in an ideal world. New nuclear cannot be built on time to cover the shortfall and you proposal for waste of "bury it and forget about it" is not a solution either.

If you want me to be specific then you need to as well.  So where for the waste.  Who by?  When?  How?

These are two difficult questions that you have ducked.

It cuts both ways


 
Posted : 10/08/2018 10:02 pm
Posts: 52609
Free Member
 

Mike – because you keep trying to hammer me on how I would cover future shortfall but when I put the same question to you I got a wishful thinking answer ” In an ideal world more nuclear”

Simply because you want to stop a massive source of energy and can barely replace that as a source with your tidal idea.

Shortfall needs to be met by building more of everything. It really is that simple.

 So where for the waste.  Who by?  When?  How?

The NDA are on that at the moment

https://www.gov.uk/government/publications/technical-issues-associated-with-deep-repositories-in-different-geological-environments

As you would expect as they have to build on for the existing HLW in the UK and the ILW Sub arrangements.

You can choose to ignore this if you want. But it will be built.


 
Posted : 10/08/2018 10:12 pm
Posts: 44799
Full Member
 

More wishful thinking.  there is no plan for the disposal of the waste.  None.  Just pie in the sky.  Where will it be built?  When?  Who by?

New nuclear cannot be built quickly enough to stop the shortfall.  simple fact.

This means that your answers to these difficult questions are simple wishful thinking.

Now until you either admit you have no answers that are practical and possible then your position is nonsensical

Shortfall needs to be covered by efficiency and energy savings.

My position is simple.  reduce consumption by converting the entire economy and taxation system to that of carbon taxes.  the polluter pays.  Yes we may need higher carbon commissions for electricity but this could easily be clawed back and more in other energy savings.  Make energy waste uneconomic.  all those big heavy cars burning fossil fuels transporting one person.  all those office building with lights left on 24/7/365.  All those  houses that leak heat. etc etc etc  Savings far in excess of the amount of carbon saved by nuclear power could easily be made.


 
Posted : 10/08/2018 11:32 pm
Posts: 52609
Free Member
 

More wishful thinking.  there is no plan for the disposal of the waste.  None.  Just pie in the sky.  Where will it be built?  When?  Who by?

The Nuclear Decommissioning Authority - a government body in charge of this stuff

New nuclear cannot be built quickly enough to stop the shortfall.  simple fact.

Probably true, but it's not a reason not to build it. We need lots of new generation being built now. Building other stuff does not stop Hinkly, building other stuff doesn't impact on Hinkly. It does not have to be an either or.

This means that your answers to these difficult questions are simple wishful thinking.

My position is simple.  reduce consumption buy converting the entire economy and taxation system to that of carbon taxes.  the polluter pays.

LOL you are going to reduce it and hope you can cover what you need?

Laughable.

Currently the user/polluter pays, energy is not free, it's a major cost in a lot of businesses who are working really ****ing hard to reduce their use to get their costs down. It's happening all over the country.


 
Posted : 10/08/2018 11:37 pm
Posts: 11605
Free Member
 

More wishful thinking. there is no plan for the disposal of the waste. None. Just pie in the sky. Where will it be built? When? Who by?

That question is entirely and utterly moot since we are already stuck with a legacy of high level waste that NEEDS a solution. Whether or not that pile gets added to makes no difference whatsoever since it will exist whether or not Hinkley does.


 
Posted : 10/08/2018 11:47 pm
Posts: 0
Full Member
 

Really good to see this device performing well, the chap was just setting up the company back when I lived in Orkney. Think it's a real clever approach given the expense and difficulty of attaching turbines to the seabed.

https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-45246445

Last sentence here sums it all up really http://renews.biz/112195/scots-tidal-hits-milestone/

“We are dismayed that there is a total lack of market support here in the UK for our technology and we have no option but to focus our business on overseas opportunities.”


 
Posted : 21/08/2018 4:21 pm
Posts: 11605
Free Member
 

It's unfortunate that right now that generators down south are paid to transmit whilst those up north pay progressively more. When (hopefully) this changes we may see the tide turn.


 
Posted : 21/08/2018 5:28 pm
Posts: 52609
Free Member
 

Yep, in the current energy game every contribution welcome


 
Posted : 21/08/2018 5:32 pm
Posts: 0
Full Member
 

What?  So a turbine is considered a success because it has generate more electricity than any other turbine before it, when actually, the only ones installed before it were small prototypes conducting small scale studies, rather than aiming to generate useable power for the grid?

what they fail to mention is exactly what each of those GWh actually cost?

So, lets see the numbers, it's done 3 GWh in a year, it lasts 20 years, we just need to know what it cost to build and install, and how much it costs to run / maintain, divide one by the other and there's a figure for the cost of the 'lecy.  And yet, where is what figure?


 
Posted : 21/08/2018 6:44 pm
Posts: 16208
Free Member
 

Building other stuff does not stop Hinkly, building other stuff doesn’t impact on Hinkly.

Its heavy reliance on public subsidy brings it into competition with other forms of energy generation needing the same. So, whilst it's true that building other stuff does not stop Hinkley, building Hinkley may stop other stuff being built.


 
Posted : 21/08/2018 6:50 pm
Posts: 66111
Full Member
 

<div class="bbp-reply-author">maxtorque
<div class="bbp-author-role">
<div class="">Subscriber</div>
</div>
</div>

<div class="bbp-reply-content">

So, lets see the numbers, it’s done 3 GWh in a year, it lasts 20 years, we just need to know what it cost to build and install, and how much it costs to run / maintain, divide one by the other and there’s a figure for the cost of the ‘lecy.  And yet, where is what figure?

You realise it's a prototype, right?

</div>


 
Posted : 21/08/2018 7:19 pm
Posts: 0
Full Member
 

what they fail to mention is exactly what each of those GWh actually cost?

if you'd read the links at all you'd see it's their first full scale prototype undergoing testing, so its costs won't be comparable to any market-ready device. Jesus this is how we ended up with brexit.


 
Posted : 21/08/2018 7:43 pm
Posts: 0
Free Member
 

Ex magnox reactor worker here so you may think I’m biased.

This country needs nuclear. It needs nuclear to keep your lights on. Renewables are needed as well and do a good job topping up what we need. But ultimately they are not reliable enough and will never be reliable enough to be the ultamite answer to our energy needs.

This country is on the verge and quite possibly too late to stop the lights goin off. Industry is given a cheaper unit price if the NG can switch them off. How long untill its households?

I don’t think that the hinkley reactor design is the best. But its what we have and its better than nothing. I don't like the fact that the turbines are dirty. This makes maintenance a pain and expensive compared to other designs.

This country used to be at the forefront of inovation and engineering. It’s a disgrace that we are relying on the french to build our reactors. But succesive governments have made sure that we don’t have the capability to build these.

Public opinion is also an issue. Too many thick  unknowledgeable people have too great an opinion and ultimately power to stop the UK from ever being at the forefront of nuclear power generation. We could sell the technology globaly. Make the UK a hub of inovation. Have a product to sell to the world post brexit. Create high paying employment for thousands of people.

But no. Nuclear=bad. End of story


 
Posted : 21/08/2018 9:01 pm
Posts: 11605
Free Member
 

Its heavy reliance on public subsidy

Say what now? Guaranteed strike price is not public subsidy, it's consumer funded. The other stations at Wylfa and (potentially) Moorside, THEY have pulic subsidy in the form of a governement stake.

I don’t like the fact that the turbines are dirty. This makes maintenance a pain and expensive compared to other designs.

That's BWR you're thinking of (Wylfa), Hinkley is a PWR with the same secondary coolant loops as the Magnox and AGR reactors so shouldn't have any contamination issues unless you got a boiler tube leak at low pressure.


 
Posted : 22/08/2018 11:16 am
Posts: 16208
Free Member
 

Say what now? Guaranteed strike price is not public subsidy, it’s consumer funded

If you honestly believe that Contracts for Difference are not a subsidy then the word has no meaning. How else should we describe a government-negotiated contract giving a doubling of wholesale power prices, to be paid for by levies?


 
Posted : 22/08/2018 11:31 am
Posts: 11605
Free Member
 

I never said it wasn't a subsidy.

I said it wasn't a [b]public[/b] subsidy which is something entirely different. I even went to the trouble of explaining that it wasn't publically [b]funded[/b] (out of government funds if you really need an explainiation of what that means) and that the costs would be met by [b]consumers[/b] (through energy bills).

As for a doubling, that's already been eroded, the strike price is about 40% above todays prices and with the state of the energy market in years to come (all the coal gone and the AGR's scheduled to come offline from 2023 onwards) that's only going one way. Unless someone brings cheap energy to the market and fast I can't see the difference being that great.


 
Posted : 22/08/2018 12:36 pm
Posts: 16208
Free Member
 

I said it wasn’t a <strong class="bbcode-strong">public subsidy which is something entirely different. I even went to the trouble of explaining that it wasn’t publically <strong class="bbcode-strong">funded (out of government funds if you really need an explainiation of what that means) and that the costs would be met by <strong class="bbcode-strong">consumers (through energy bills).

So it's not a public subsidy, but a subsidy funded by the public. Gotcha.


 
Posted : 22/08/2018 1:19 pm
Posts: 11605
Free Member
 

If you need the definition of a public subsidy explained to you then really you have no place in this conversation.


 
Posted : 22/08/2018 2:17 pm
Posts: 16208
Free Member
 

If you need the definition of a public subsidy explained to you then really you have no place in this conversation.

You are of course free to continue the pretence that a subsidy funded by the public is not a public subsidy.


 
Posted : 22/08/2018 2:26 pm
Posts: 14536
Free Member
 

Wylfa II is going ahead no matter what the govt say. They are doing the prelim work now around it (I rode past it on Sunday) and there have been pretend public consultation exercises about the pylon routes for over 2 years now. It's all done and dusted and no amount of discussion or protest can stop it now.


 
Posted : 22/08/2018 3:15 pm
Posts: 0
Free Member
 

Wylfa isn’t a bwr. It has a graphite core cooled by Co2. The turbine side is clean. I should know. I worked there.


 
Posted : 22/08/2018 8:30 pm
Posts: 0
Full Member
 

[quote=bigjim] it's a prototype

I know it's a prototype (the tidal turbine).  That is my point EXACTLY!   It's why i was suggesting that claiming it's a massive success is pre-emptive in the extreme...

For example, in my home county of Oxfordshire, there are currently precisely zero badger powered generators, so i could install such a device, and then proclaim "my badgerator (tm) is the most biggly successful super generator ever, it's made 1 million times more badger derived energy than ever generated before" despite it only making 3whr in total.

People can moan "how come XXX (<< insert new tech here) hasn't taken off, it is a conspiracy by the industry/politicians/deepstate/media (delete as appropriate)"  as much as they like, but simple capitalism is the reason new, un-proven and low return technologies don't take off immediately if at all.  Financiers with money are always going to put most of their money into proven tech with secure returns


 
Posted : 22/08/2018 9:04 pm
Posts: 0
Full Member
 

so you're saying it's actually an unsuccessful prototype? What must the first prototype achieve to be a successful exercise?


 
Posted : 22/08/2018 9:33 pm
Posts: 52609
Free Member
 

What must the first prototype achieve to be a successful exercise?

For me it's a prototype so a long way from full scale deployment or production, costs are to be determined and there is uncertainty.

While people feel the need to bash Hinkly for it's price or delays elsewhere I've not seen a ready to go solution that will take it's place.


 
Posted : 22/08/2018 9:35 pm
Posts: 0
Full Member
 

and your bizarre closing paragraph shows exactly why emerging technologies require support and investment from eg government etc??? that's the whole gist behind technology companies complaining about the recent lack of government support and investment....


 
Posted : 22/08/2018 9:43 pm
Posts: 52609
Free Member
 

bizarre? Or true, it's good judgement to build Hinkley, it's a sensible proposition at the moment. It should not stop development of other technologies or funding of them. But aside form just cash it provides the ability to have stable generation while we experiment with those technologies.


 
Posted : 22/08/2018 9:50 pm
Posts: 0
Full Member
 

[quote=bigjim] are you saying it's an unsuccessful prototype

no.  i am saying it's too early to draw conclusions.  To be "successful" any prototype must demonstrate beyond reasonable doubt that the technology it demonstrates is viable.  For a tidal turbine, the things that matter are going to be the cost to build, the cost to install, the cost to maintain, it's realistic life time, and both the total energy generated (£ per GWhr) and the actual capacity factor averaged over a year (ideally, longer).  On top of that, we get practical factors like available morning sites, effect on marine traffic and marine life, ease and availability of power interconnects.  The list goes on and on.

So really that gets back to my initial point, which was to say this prototype is a "phenomenal result" (Andrew Scott, chief executive officer of Scotrenewables) simply because it has generated more power than any other tidal turbine, when no other large tidal turbine has ever been installed or trialed for as long, is rather pre-emptive wouldn't you agree?


 
Posted : 22/08/2018 10:06 pm
Posts: 11605
Free Member
 

Wylfa isn’t a bwr. It has a graphite core cooled by Co2. The turbine side is clean. I should know. I worked there.

I was referring to the new one which will be a Hitachi ABWR, apologies.

You are of course free to continue the pretence that a subsidy funded by the public is not a public subsidy.

Could you show me on a diagram where the money is being drawn from the public purse (ie. government funding)? Your logic is arse backwards, it is not subsidised by the public, it is subsidised by consumers. You are free to take all your energy from off-grid sources, pay all your taxes as normal and bask in your own smugness that you are NOT subsidising Hinkley C. Therein lies the difference.

The closest analogue I can think of would be Ineos building a new refinery that would be paid for via an extra tariff on fuel charged at the wholsesale level when it started producing up to a certain ceiling. No production, no money. Only product users are affected.


 
Posted : 22/08/2018 10:16 pm
Posts: 0
Full Member
 

simply because it has generated more power than any other tidal turbine, when no other large tidal turbine has ever been installed or trialed for as long, is rather pre-emptive wouldn’t you agree?

but that's not what he said, and there are other large tidal turbines that have been installed, some for many years longer eg  https://en.wikipedia.org/wiki/SeaGen . Your first paragraph also shows you have no understanding of existing, historic and planned developments and the processes that have been developed to support their development from the initial site selection work through the planning system which address the rest of your random list. Go read the meygen EIA for example.

It's a fantastic result for a great little British engineering firm that started as an idea in a garage and will hopefully go on to great success even with minimal UK support.


 
Posted : 22/08/2018 10:48 pm
Posts: 44799
Full Member
 

I seem to remeber mini reactors being prposed on here as a solution.

Article in the Grauniad showing they are ot.  Not possible to be on line for 20+ years, need huge subsidies, rubbish designs,

Backers of mini nuclear power stations have asked for billions of pounds of taxpayers’ money to build their first UK projects, according to an official document.

Advocates for small modular reactors (SMRs) argue they are more affordable and less risky than conventional large-scale nuclear plants, and therefore able to compete with the falling costs of windfarms and solar power.

But the nuclear industry’s claims that the mini plants would be a cheap option for producing low-carbon power appear to be undermined by the significant sums it has been asking of ministers.

Some firms have been calling for as much as £3.6bn to fund construction costs, according to a government-commissioned report, released under freedom of information rules. Companies also wanted up to £480m of public money to help steer their reactor designs through the regulatory approval process, which is a cost usually paid by nuclear companies.

https://www.theguardian.com/environment/2018/sep/30/energy-firms-demand-billions-from-uk-taxpayer-for-mini-reactors


 
Posted : 30/09/2018 6:08 pm
Posts: 4333
Full Member
 

Electricity generation is expensive $3 Billion to construct a 960 MW coal plant then ongoing fuel costs, externalised pollution costs ( NOx, CO2, particulates, radioactivity all not paid by the generator).

The big advantages of SMRs in my view is that the upfront cost is relatively low. The risky part of nuclear build is construction. Current 1GW projects tie up masses of capital for a long time in the riskiest phase. An SMR can get the first 300MW online before committing capital to the next.


 
Posted : 30/09/2018 6:32 pm
Posts: 44799
Full Member
 

Which is why that money needs to go into tidal instead.


 
Posted : 30/09/2018 6:34 pm
Posts: 66111
Full Member
 

£3.6bn is not a lot of money when you consider this is arguably the world's most important industry- and if Rolls Royce or others can get ahead of the competitors (which should be easier now with Westinghouse being screwed and EDF being bankrupt) then it's going to be worth billions more to the UK to be the leader- just as with tidal. Not to mention having a potentially world-changing effect on carbon output. Instead we're pouring money into the literal exact opposite

It shouldn't be a case of that or tidal, we can afford both and we'd benefit from both. The two complement each other and neither can hope to benefit from us vs them- the enemy is government's refusal to invest and support critical industries not the other generation method.


 
Posted : 30/09/2018 6:40 pm
Posts: 44799
Full Member
 

Murray - they are asking for 4 billion subsidy up front.


 
Posted : 30/09/2018 6:42 pm
Posts: 0
Full Member
 

It would be frustrating if the money was doled out to the nuclear industry but not the renewables industry. Funding for renewables in the UK will be in the order of millions, in lots of little dribs and drabs, but certainly not on that scale or what O&G received.


 
Posted : 30/09/2018 7:44 pm
Posts: 7124
Full Member
 

Deleted.


 
Posted : 30/09/2018 8:03 pm
Posts: 44799
Full Member
 

Thats my point big jim.  with limited investment funds available why is the vast majority spent on nuclear when we have other cheaper stuff that can get on line in years not decades

44 million already given to the nuclear companies by the government for these small nukes.  That much money would make a huge difference in the renewable industry


 
Posted : 30/09/2018 8:11 pm
Posts: 11605
Free Member
 

44 million already given to the nuclear companies by the government for these small nukes.

Now now, what have we discussed about being honest?

phase 1: funding (up to £4 million, excluding VAT) to undertake a series of feasibility studies for AMR designs. Contracts are worth up to £300,000 (excluding VAT)

phase 2: subject to phase 1 demonstrating clear value for money and government approval, a share of up to £40 million (excluding VAT) could be available for selected projects from phase 1 to undertake development activities. Up to a further £5 million may also be made available to regulators to support this

That money has not been given yet. Phase 1 has barely begun. Mind you, from the tone of the article I'm not sure facts were at the forefront of anyone's mind, particularly Mr Lowry. Rolls Royce for example are essentially proposing submarine reactors which are neither discredited nor unproven. Sure there are some like the thorium reactors or sodium breeders that are further down the line (and some royal piss takers like GE who wanted to double charge us to deweaponise our plutonium stockpile) but some of these have been in development for years and are now becoming technologically viable. Same as fusion, same as tide, same as solar.

And "nukes"? Gimme a break.


 
Posted : 01/10/2018 12:09 am
Posts: 44799
Full Member
 

Sorry - not already given - already allocated.  that do?  Again it shows how distorted the electricity market is and how nuclear gets funding that is denied to renewables

Why the government is so pro nuclear and so anti renewables is hard to fathom


 
Posted : 01/10/2018 7:29 am
Posts: 11605
Free Member
 

Yes its better as the bulk of it will only be awarded subject to it presenting value for money which is an important factor. How many renewables schemes have had a value for money criteria attached? How many renewables schemes had feed in tariffs?

Now I'm not arguing against these as clearly they encouraged uptake and development where applied appropriately. As someone pointed out in another thread Scotland is generating most (54%) of its electricity via renewables so its hardly a struggling industry. I just don't understand this mentality where it has to be one or the other.

That article was talking so much crap it was unbelievable. Yeah they may have asked for the money (4 billion or whatever the figure was) but did they actually get it? Its lazy agenda driven writing (not really fit to be called journalism) based around nothing more than the opinion of a talking head, I've seen similar output from a local paper. No wonder they have a begging bowl if that's the standard.


 
Posted : 01/10/2018 8:02 am
Posts: 16208
Free Member
 

Could you show me on a diagram where the money is being drawn from the public purse (ie. government funding)? Your logic is arse backwards, it is not subsidised by the public, it is subsidised by consumers. You are free to take all your energy from off-grid sources, pay all your taxes as normal and bask in your own smugness that you are NOT subsidising Hinkley C. Therein lies the difference.

Give over. The money would not be available without the government making it available. If the government makes it available then it is a public subsidy because the government is a public body. That's why the government needed approval from the European Commission under State Aid rules.

<span style="font-size: 0.8rem;"> Your mistake is to assume that public subsidies must take the form of direct taxes. They do not.</span>


 
Posted : 01/10/2018 8:23 am
Posts: 11605
Free Member
 

<p><p>Jesus, fine, call it what you like but it's still not coming from government funds. My taxes are not funding this and I am not being taxed on anything to fund this, as far as I'm concerned it's a consumer-side subsidy. It's essentially the TV Licence argument and the same thing that allows the BBC to say it is independent and not government funded.</p></p>


 
Posted : 01/10/2018 1:44 pm
Posts: 16208
Free Member
 

Jesus, fine, call it what you like but it’s still not coming from government funds. My taxes are not funding this and I am not being taxed on anything to fund this, as far as I’m concerned it’s a consumer-side subsidy

It's being funded through the direct action of the national public authority. That is a public subsidy by any sensible measure.


 
Posted : 01/10/2018 2:14 pm
Posts: 52609
Free Member
 

It’s being funded through the direct action of the national public authority. That is a public subsidy by any sensible measure.

If you want to call it that then you should probably point out where the funds are coming from - if not you could be seen to be using semantics to mislead and I'm sure that is not what you are trying to do.


 
Posted : 01/10/2018 2:19 pm