Full details and latest information will be on the pinned post on the Ride Sheffield Facebook page if you want to check the status in the coming weeks.
Due to the huge amount of rain we’ve had recently the water table in Lady Canning’s has risen massively and the volume of water has caused damage to the trail. There are even a couple of springs rising through the surface of the trail itself. We need a dry period to get the water table to lower and when this happens we’ll be able to fully assess the damage and the best way to fix it. We’ll also get the new start put in at the same time all being well.
Please do not ride the trail while it is closed. We did tape and some blocks at the end of last week but it has clearly been ridden over the weekend further damaging the trail. We’ve been back in today and covered the trail with obstacles every few metres and tape at intervals as well.
If you have any questions drop me an email (in profile), email info@ridesheffield.org.uk or post here.
Thanks
Ride Sheffield