All Diversions at Ae are now lifted. There has also been resurfacing works at Granny Green Luv and most of Bran Burn Bash, a lot of which has been done by volunteers. Surfacing at Nil Desperandum is due to start soon as well, so the areas where we were getting most of our complaints have now hopefully been addressed. The bombhole just before post 21 has been eventually finished, plus the small section of trail after The Edge which had been washed out when the river flooded has had a new line put in. From a mtbikers point of view, I'd say Ae is pretty good at the moment!
The red route and the Shredder are both closed for Saturday and Sunday due to the Enduro Avalanche, the trail is open on friday though!
SLW – Please don't encourage anyone to pass through diversions for 2 reasons. First is basic health and safety, its closed off for a reason. Second is that when a trail surface isn't finished you do a load of damage by tracking over it. Much more than you would believe. It then takes us longer to repair it, which in turn means the diversion stays in place for longer. So pleeeeease stay off unfinished trail!!!
Cheers