Topic starter
I seem to have lost/misplaced the instruction sheet that came with my tin of Framesaver. I've applied 1 coat and was wondering whether anyone knows how long I need to let it dry for before applying a second coat (or can point me in the direction of the JP Wiegle's website, despite Google I can't find it).
Posted : 07/05/2010 6:20 pm