Topic starter
For the Bristol riders, you've probably noticed that after being "pencilled in" for mid-April, the logging operations in 50 Acre Wood have so far failed to materialise. However the ranger has just called me to let me know that they'll be starting in around 2 weeks' time.
Posted : 19/06/2009 4:39 pm
Topic starter
More details on the original thread here:
http://www.singletrackworld.com/forum/topic/psa-bristol-trail-closure
Posted : 19/06/2009 4:40 pm
Can they do something about those two bloody trees at the start of the final section, just before your gnar-core drops? I don't want them gone, necessarily, just moved slightly further apart. Pies, you see.
Happy Birthday, by the way. Hope someone got you a razor, and possibly a haircut ๐
Posted : 19/06/2009 5:35 pm