Massive problems? Such as?
Our steel frames have been delayed. I think that’s all. I can’t think of anything else. Massive problem? Hm.. It’s been quite annoying, but thats it really.
Steel frames are a different factory, different agent. They’re also staying for at least a year, to ALLOW us to concentrate on this FS project with a completely different team. If the steel frames had been early, I’d probably have been tempted to do another revision to them – which might well have impacted on the FS stuff. so in a way it was quite good.
ps: top tube will change for production, geometry too. rear dropout, other stuff too.
We might throw some graphic ideas up today, if @Mattmagic decides to. He put that pic up yesterday when I was sat talking to Ben @ Recycle and wiping dog shit off the rocker link. Dirty Ben.