Topic starter
I have four bulbs and four ballasts.
I want to be able to run them in two configurations...2 bulb and 4 bulb (so I assume I need two switches).
How do I wire them all together (in what order etc.) and what type of cable do I need?
Joe
Posted : 10/02/2011 3:31 pm
