Could anyone with any experience of this let me know what your thoughts are please?
There’s an inspection pit under a car port in our new place. I’m getting rid of the car port and also want to fill in the pit so the area can be used as driveway. My plan was to fill it with some of the arisings from removing the car port (there’s a concrete beam and a brick pillar), but what’s the best way to do this to ensure a stable surface? The port also has a base of large rocks (I know, sounds mental) which I thought I could use in the bottom of the pit, then fill in layers of smashed bricks and concrete with more large rocks. Maybe I’d manually tamp everything down in layers, and when it comes to the last 100mm just infill with type 1, sand and cut some blocks to form the surface before the usual finishing touches.
How would this sound? The rest of this area is concrete but I don’t mind a block patch as it’s an out of sight area anyway. I could just as easily pour concrete in the last 100mm?
Do you reckon this would be stable enough?