Forum search & shortcuts

Dumyat. Another cra...
 

[Closed] Dumyat. Another cracking descent gone....

Posts: 17459
Full Member
 

Hahaha, neither it was 😀

Thanks my for correcting me Nobrainsinthehead 😀


 
Posted : 11/09/2017 9:26 pm
Posts: 1274
Full Member
 

Fair play to the Stirling mob for standing up and calling foul.

When I heard there was a path being constructed, I naturally assumed it'd be something along the lines of the handbuilt, pitched rock stuff I enjoy riding in the Lakes, or in a worse case scenario, something like that path that was shown in the video a couple of pages back.

My initial reaction on seeing the photos was ,"Well, that's not even remotely finished", but now I'm beginning to understand how wrong I was. I would not have believed that the company who won the tender would so blatantly ignore their own plans, fines should be imposed on them, but I also can't believe that it came down to a public outcry before work stopped. Where were the folk who approved the work?

Dumyat still needs some sort of armoured path to cope with the sheer number of folk heading up and down it in all weather conditions, let's hope that it'll get done properly now.


 
Posted : 12/09/2017 11:38 am
Posts: 44021
Full Member
 

It's McGowans carrying out the work. As already posted, they have previous on Cairngorm with work supposedly to be carried out by hand and then using trucks and diggers. I guess it's easy to win contracts and make profits when you can undercut those who would actually do it properly.


 
Posted : 12/09/2017 11:42 am
Posts: 8527
Free Member
Topic starter
 

Fair do's BB, I do definitely agree that there are sections that a properly armoured path would be great. Mainly the bog and that bit up near the top that there's loads of gullies on.

Yours,

Nobrains.


 
Posted : 12/09/2017 12:42 pm
Posts: 17459
Full Member
 

Where were the folk who approved the work?

This is a key point. It's not normal to just leave the Contractor to it in these situations. There should have been a site kickoff meeting, reviews of Method Statements, daily toolbox meetings, supervision by Client Rep etc etc ...

All very very odd.


 
Posted : 12/09/2017 12:50 pm
Posts: 191
Full Member
 

Welcome to the world of 21st century procurement - with Edinburgh Schools and defects at Dumfries Leisure Centre etc what chance does a path have 😕

Again well done to BofA lads. And to Beagy takes a big man and all that 😈

(Just off to have my head scanned to see if I do have a brain 🙂 )


 
Posted : 12/09/2017 1:50 pm
Posts: 173
Full Member
 

I was up at the path on Dumyat last night in the rain. Obviously the path is not complete but was already suffering with drainage issues. McGowan really have tried to hide the mess by dragging 1m sections of turf over the sides to make the path look narrower.

Would have been a good idea except that under the turf is the previous rock path and in places exposed rock (Dumyat biking is all about exposed rock). This turf will die in about 4 weeks time leaving yet another problem. I stood on one bit and could rock it backwards and forwards like a surfboard.


 
Posted : 13/09/2017 11:03 am
Posts: 2559
Free Member
 

Does anyone have an update for non-locals who are curious as to what is happening?


 
Posted : 19/09/2017 4:56 pm
Posts: 46238
Full Member
 

Yes - lesser works agreed, in line with contract, going forward, particularly the boggy bits not the bedrock sections.. The existing cock up to be made as best as possible.

Local green MSP (and mountain biker) is all over it...as are so many local riders. One mess up and it will be reported on.


 
Posted : 19/09/2017 5:02 pm
Posts: 0
Free Member
 

Nice work!


 
Posted : 19/09/2017 5:05 pm
Posts: 2559
Free Member
 

\o/


 
Posted : 19/09/2017 5:10 pm
Posts: 658
Full Member
 

Excellent! Well done all. That sound like a remarkably positive outcome compared to what I was expecting to happen.


 
Posted : 19/09/2017 5:11 pm
Posts: 8527
Free Member
Topic starter
 

Excellent.

Dare I say it, the boggy bit getting sorted will result in a better descent than it was.

Happy days.


 
Posted : 19/09/2017 5:39 pm
Posts: 3200
Free Member
 

Joint Statement:

An on site meeting took place at Dumyat last Friday between a number of stakeholders and SPEN . There was an opportunity for SPEN and the contractors to explain how the path was being constructed . A number of people representing different organisations expressed their views these included the following:

The visual look of the path

The loss of the natural rock outcrop

The over engineered construction

The need to do something about the bogging area

The original lack of signage

The width of the path

The steepness of the path

After a discussion facilitated by Councillor Alasdair Tollemache the following was agreed:

1The section of path which has been started will be completed

2 Once this is completed there will be period when people can look at this and feedback given

3 There will be parts of the path where potentially no work will be done

4 The bogging section will be resolved

5 if there is a feeling amongst the stakeholders that he path construction is not want people want it would be removed

Councillor Alasdair Tollemache

SPEN STATEMENT

Dumyat Hill Path Statement

The recently started project to improve the Dumyat Hill path has given rise to some local concern. The project was approved by the Beauly Denny Partnership Group, which includes representatives from Stirling Council, the Scottish Government Central Scotland Green Networks and SP Energy Networks, and was designed following an extensive period of consultation. The work is intended to address the ongoing deterioration of the existing path as it continues to grow in popularity, and was taken forward by SP Energy Networks as part of its commitment to invest in local visual mitigation projects following the construction of the new power line.

In order to address the concerns raised, recent meetings have been held with a range of stakeholders, including a number of local elected representatives. The discussions covered the sensitivity of the Ochil Hills landscape and provided an opportunity for SP Energy Networks and its contractors to explain the construction process and the techniques employed.

SP Energy Networks Transmission Director, Pearse Murray, said:

“The recent meetings have been constructive and we are pleased to be able to take forward a range of improvements that have been initiated locally and endorsed by both The Beauly Denny Legacy Steering Group, and the Beauly Denny Partnership Group. The contractors working on the project are highly experienced specialists, with an extensive track record of working in environmentally sensitive areas. We apologise for the short-term impacts while the work is underway, but the end result will deliver improvements in keeping with the local landscape and the vision that was approved by the Partnership Group.”


 
Posted : 19/09/2017 7:02 pm
Posts: 46238
Full Member
 

So much Business Bullshit Bingo from the SP Energy chap....

But a great result so far...


 
Posted : 19/09/2017 7:07 pm
Posts: 0
Free Member
 

Dare I say it, the boggy bit getting sorted will result in a better descent than it was.

Not really, does anyone actually come down that way?


 
Posted : 19/09/2017 9:04 pm
Posts: 8527
Free Member
Topic starter
 

Mibbe I'm getting the boggy bit mixed up! Isn't it just right after the really Rocky section, big jaggy bedrock bastard then through a bog and back over the wee stile/fence?.


 
Posted : 19/09/2017 9:40 pm
Posts: 0
Free Member
 

er so there might be two boggy sections to discuss 🙂

There's also the really wide big section you have to get through on the way up. Always minging even in summer. Fixing both would be good!


 
Posted : 19/09/2017 10:17 pm
Posts: 8527
Free Member
Topic starter
 

Aye, know the bit you mean matey.


 
Posted : 19/09/2017 10:31 pm
Posts: 1274
Full Member
 

So, are the contractors and SP energy basically saying there was nothing wrong with their approach, and to just wait and see what the finished section of path looks like?

In my head, and I'm sure everybody and their granny is ready to pitch in and tell me how wrong my head is 🙄 , they flattened and covered that rocky outcrop so they could lay pitched steps in its place. Not ideal, but it would have alleviated the multiple, eroded lines around that section by channelling everyone up the same route. Was that their original plan, which we just haven't seen completed yet? Or were they simply going to bulldoze and lay a flat gravel path all the way to the summit?


 
Posted : 20/09/2017 8:31 am
Posts: 8527
Free Member
Topic starter
 

Sounds like the contractors intentions were way off SP networks, who knows what it would've ended up looking like.


 
Posted : 20/09/2017 8:49 am
Posts: 3200
Free Member
 

Today's photo.

https://drive.google.com/open?id=0B1GDq2XvKqUVclZLVzlKV1c2WDVtYl85bkhTRDlrSlROR29J

Breathtakingly unbelievable. This is not what we agreed.
The local councillor is on the phone to senior directors at SPEN. Seriously unimpressed.


 
Posted : 21/09/2017 6:30 pm
Posts: 8527
Free Member
Topic starter
 

That's just bizarre!


 
Posted : 21/09/2017 6:42 pm
Posts: 0
Free Member
 

I get the feeling whoever is running the site works didn't take in a single word of the discussion


 
Posted : 21/09/2017 10:31 pm
Posts: 3200
Free Member
 

I've put the article from Wednesday's Observer here:
https://photos.app.goo.gl/XiTePjweMSKcqY6x2

Captures what was agreed.

I get the feeling whoever is running the site works didn't take in a single word of the discussion

Legend - it would appear so.

Will let you know what develops today....


 
Posted : 22/09/2017 7:30 am
Posts: 46238
Full Member
 

Is it being thick, arrogance or misplaced sense of 'this is better'?

Grrr


 
Posted : 22/09/2017 7:50 am
Posts: 0
Free Member
 

Cllr Alasdair Tollemache has been back in touch with SPEN following the above


 
Posted : 22/09/2017 9:23 am
Posts: 0
Free Member
 

So they took the feedback about what they needed to do to make it actually better and decided to make 2 completely separate trails instead? Weird.

Truly great work everyone working against this, though. I grew up riding up there, and all the photos bring back some fond memories, as well as a sense of disappointment.


 
Posted : 22/09/2017 10:01 am
Posts: 11632
Full Member
 

Have sent another flurry of complaints, unlikely to make much difference going by the latest developments.


 
Posted : 22/09/2017 6:39 pm
Posts: 3200
Free Member
 

The latest on Dumyat:

Stirling Council to stage meeting over anger at 'second track' on Dumyat Hill

http://www.dailyrecord.co.uk/news/local-news/stirling-council-stage-meeting-following-11254315#ICID=Android_DailyRecordNewsApp_AppShare


 
Posted : 28/09/2017 6:07 pm
Posts: 46238
Full Member
 

Ive complained again to SpEn and not had reply....

Glad you and Bruce are on it - I would join you tomorrow if I could, but I'm training in Fife...


 
Posted : 28/09/2017 6:10 pm
 km79
Posts: 0
Free Member
 

Cycling-UK Right-To-Rep for Stirling, Dr Crispin Bennett
Good work but I think you need a catchier title!


 
Posted : 28/09/2017 6:14 pm
Posts: 11632
Full Member
 

I couldn't get time up work but another interested party is going to represent the club (as well as Bruce).


 
Posted : 28/09/2017 6:24 pm
Posts: 8527
Free Member
Topic starter
 

Good work folks.


 
Posted : 28/09/2017 6:59 pm
Posts: 3200
Free Member
 

From Stirling Council:
"I now attach my note of the meeting which should be read in conjunction with a separate summary and mapping from Chris Cairns and Bob Aitken, also attached. This includes Section 3 :- 'A revised approach to current and future repairs' which I am of the view is a fair summary of the proposals discussed at the meeting.
Given the oncoming winter it may not be feasible for the finally agreed scope of works to be completed this year however, as highlighted in the proposals, the timeous completion of the initial section of path would pre-empt winter damage."

Attached files at:
https://drive.google.com/file/d/0B1GDq2XvKqUVd3lVbUhDZHpfVWFhaVdNZnlSQlBYMnU1UWhr/view?usp=sharing

https://drive.google.com/file/d/0B1GDq2XvKqUVVk9tX195VXNEVllJYjBZaEc1ZmMtSTV3T3BR/view?usp=sharing

https://drive.google.com/file/d/0B1GDq2XvKqUVX2pCTkRwSGdHSWFsMjFLYjdDQnk5dGVhUXpZ/view?usp=sharing

A definite improvement on what was planned but still some arguments to be had. I'll put together my response on Thursday, following discussion with my biking friends. Please email if you have any thoughts.


 
Posted : 17/10/2017 7:22 am
Posts: 46238
Full Member
 

I was up there last night with my European visitors. The mud path Futher up is so slippery most of them to to the grass edge and last few bits of bedrock...


 
Posted : 17/10/2017 7:49 am
Posts: 1974
Full Member
 

Any update on the state of play with the Dumyat path at the moment?


 
Posted : 09/11/2017 6:27 pm
Posts: 46238
Full Member
 

Muddy at lunchtime.


 
Posted : 09/11/2017 6:55 pm
Posts: 3200
Free Member
 

Work is halted.

A path expert called Bob Aitken has offered to come out of retirement and help. A massive thanks for his efforts.

A group talked through the proposals on the hillside a few weeks back (the third Friday on the trot - two or three MTBers were present) and consultations have been bouncing around. The proposed work has been scaled back considerably but a fair bit is still planned. Three responses were received back, including mine and a MTBer ecologist.

Waiting for Stirling Council who are now driving the process (ahem) to come up with the next steps.

I had a face-face yesterday with SPEN - who are contracting a contractor who are contracting MacGowan's - where I said again that I am happy to accept what Bob Aitken comes up with, but do not trust MacGowan and that they must follow the spec and I want every inch of their work supervised.

SPEN also have ideas to help Dumyat going forward - adopting path maintenance etc but this is early stages - and full credit for their approach here.

Please email if you want more info - or come to the brewery on a Friday 🙂


 
Posted : 09/11/2017 7:27 pm
Posts: 3200
Free Member
 

I have posted an update onto a new thread:

http://singletrackworld.com/forum/topic/dumyat-an-update?replies=1#post-8947642


 
Posted : 06/01/2018 8:34 am
Posts: 26
Full Member
 

Hi,

Are there any Stirling locals who know what's going on with the trails from the Monument on the Sheriffmuir Road? The track north from the Monument to the Gathering Stones has already been given the full motorway treatment (eight feet wide with mini-road roller up there today). The track that heads SW from the Monument (the one almost parallel to the road) looks like its being prepared for the same.

I'm more than happy to contact the Council / local councillor but I wanted to see if I could find out some more details first.

Thanks


 
Posted : 12/08/2018 8:12 pm
Posts: 0
Free Member
 

Never seen this the first time, so have they killed it? Any detailed, recent pics of the area?


 
Posted : 12/08/2018 8:40 pm
Posts: 26
Full Member
 

Hopefully this link to the tracks works ok.

https://www.dropbox.com/sh/xjegu0zbraabmcy/AADUD8hXHi3-lgsMG92F719Xa?dl=0


 
Posted : 12/08/2018 9:26 pm
Posts: 1753
Full Member
 

It's just more of this ridiculous "upgrade" of the core path network in the area. I've contacted the council to no avail.

They've ruined this trail for no access reason that I can see. Access into the Gathering Stone ... maybe but ... down to Dykedale? Really?

My fear is the Wharry Burn is going to go the same way.


 
Posted : 12/08/2018 9:42 pm
Page 5 / 5