Topic starter
Anyone have any tips how to go about it.
I'm going to build it ontop of the current ground level rather then dig down into it.
Posted : 18/07/2010 8:40 pm
Ask on SingletrAction we are on Mk3 at the moment up at Dalby.
Mk1 at Stainburn (watch this space for a major rebuild).
Mk2 at Thackley, riding well and being extended as we speak.
Mk3 at the building stage....
Or check out vids of Lee Quarry
http://www.singletraction.co.uk/index.php
Posted : 18/07/2010 8:53 pm
I was sort of involved in building one. I'd say do half and half - half above and half below - only so the earth you scrape out is used to make the bumps etc - otherwise you'll have to move a hell of a lot of earth in to build.
Posted : 18/07/2010 9:02 pm