There’s been some pretty nifty building going on in places.
North on the canal from the Tame Otter crossing over by the bunker…
Left: there’s a bombhole with multiple tracks ending in it. A couple of ok, but not amazingly well thought out drops into it & one absolutely retarded (nasty landing & run-out), but very solidly made drop going into a step-up. Further up the hill there’s a decent gap jump with a couple of options into a sweeping berm.
All of that was very soggy leafy a couple of weeks ago and hard to ride in control on.
Right: there’s some tracks up the hill along the way as you go round but there’s a brand spanking new one maybe half a kilometer along with some superb berms and a tabletop (that I think should be 3 times as long 🙂 ) Someone’s also stuck a step-down in about 2/3 of the way down
cos they weren’t very impressed with the small drops/jumps to flat (this may have been me )
Carry on further round and there’s a drop line and a couple of jumps.
Bit further round there’s a bigger drop with a very nice run-out – yet to do this, but so much work has gone into the construction it’d be rude not to some time.
The bermy one: http://www.pinkbike.com/video/343250/ (needs a sweep)
Edit: Tarmac (Lafarge) & MOD own it apparently. Looks like it’s not gonna be quarried for some time to come – http://friendsofhopwaswood.co.uk/