    what would the best order of things? Son wants to get a new kitchen fitted with new tiling too. The electrics are pretty sub standard throughout the place. Really not sure whether to get the kitchen fitted out and then do the electrics risking chasing through new tiles, or get the electrics done trying to make sure the kitchen electrics are correctly placed for the kitchen units. Hmmmmmm…
    Ps I ain’t doing it, leaving it all to professionals.

    djflexure
    Full Member

    Rewire – no point refitting kitchen first, may also need specific specs if they want to run induction hob.

    el_boufador
    Full Member

    Rewire, definitely

    tall_martin
    Full Member

    +1 on rewire first.

    Maybe plan kitchen for spec on cooker but also for where you want the sockets/ under cabinet lights

    muddyjames
    Free Member

    The kitchen could be on its own circuit and hob and oven would be separate anyway so you could rewire kitchen as part of kitchen install. if you’re moving any appliances or adding sockets or Spurs you’d need to do a fair chunk of this anyway plus you’d likely be making a mess anyway. Rest of house Re wire done separately.

    djflexure
    Full Member

    That’s exactly what we did – the consumer unit had already been sorted as we dealt with that and the rest of the house first

    trail_rat
    Free Member

    I did rewire and left kitchen 6 years ago

    Kitchen fitted yesterday with a kitchen rewire.

    jodafett
    Full Member

    As the electrician who rewired our house said “Rewiring a house is the messiest job there is”. We’ve just built an extension and it was less upheaval than the rewiring was!

    nickdavies
    Full Member

    Rewire first, but have the kitchen planned first so you know where all the electrics etc need to go.

    FunkyDunc
    Free Member

    Re wire first, at least then you might have a house to put a kitchen in

    trail_rat
    Free Member

    but have the kitchen planned first so you know where all the electrics etc need to go.

    Only if your doing the kitchen in the next 15 minutes.

    Between us rewiring and us doing the kitchen our plans changed significantly.

    Thankfully my electrician said not to do as you describe and to wait till we have the kitchen ordered before committing to wiring in the kitchen.

    He was right.

    nickdavies
    Full Member

    Doesnt sound like op’s son is planning on waiting 6 years to do the kitchen….

    trail_rat
    Free Member

    Doesn’t sound like he has the money to do both immediately either.

    mikeyp
    Full Member

    Rewire first & make sure you allow for UFH in the wiring plans

    plop_pants
    Free Member

    Thanks for your help everyone. This is a job that will all be done at once. Sounds like my son might have to move back in with the oldies for a while if the rewire is that messy!

    vintagewino
    Free Member

    Rewired (and replumbed) our entire house 18 months ago. It really is that messy!

    joshvegas
    Free Member

    Rewire.

    Getting stuff finished then having to rip dirty great strips out of every wall and fishing holes in all the ceilings sucks the biggest of hairy balls.

    IA
    Full Member

    We did both and rewire first for sure. But we planned the kitchen before the rewire. So I guess rewire second? Fit kitchen third.

    Messy job, as above. Though ours needed chased in EVERYWHERE as all the existing wiring was in white plastic conduit on the walls. Yup. All of it.