Looking for some advice getting three engineers setup so we are all pulling settings from the same location – Templates, Design Data etc.
Vault isn’t an option, Engineering Director has decided all our filing is to be done through Sharepoint.
We’re all working from one Project and folders for the Templates, Design Data, Content Centre etc are all in the same location, but are having some issues as we can’t point the file locations in Application options to the same locations as the folders in the Project setup, just doesn’t like them as a location and goes back to defaults.
Getting the Materials Libraries to sync seems to be a problem as well.
Resellers ticket system is being too slow at the mo, plus real world experience helps!