Forum menu
I've got a pallet of celotex to insulate the shed. Should be pretty toasty I think.
So things are coming along. Due to commission the system on Tuesday.
We have replaced all the radiators in the house and flushed the system several times with cleaner.
The pipework is done ready to disconnect the fuel stove and switch to the Hapero.
The accumulator has been tweaked and we have good water pressure/flow.
The energy house is almost complete:
To dos include the wiring (including inverter etc for the PV due to go on the south roof), curtain drain / guttering / ridge tiling and compounding the shed. And a million and one other little jobs that I keep thinking of - such as a limescale filter on the water main!
Well we are commissioned and have been running for 5 days. So far I am delighted! A leaky pipe when we pressurised the system was fixed fast and the boiler has been working away merrily, the house is warm and everything seems good so far.
We are using a weather compensated system and I thought the external sensor was ugly so hid it...
The PV is on and running happily:
and the inside of the boiler house is coming together. Still not insulated it yet.
Topping up the hopper at my stepdads place this morning. Its amazing how much timber the thing gets through through.
[url=http:// http://www.photobox.co.uk/my/photo/full?photo_id=20691050533 ][/url]