Ive been looking at a similar build from Black sheep cycles
Email or ring James then.
He’s quite helpfull.
Be prepared to wait a lot longer than he tells you’ll have to.
If he tells you 3 months you’ll be looking at 6 months minimum.
He’s built 3 frames for me in the past and every one was an excersise in frustration.
Oh and don’t be surprised if he stops answering emails/phone calls when he’s a couple of months late finishing your build. 😆
Some build pics from my first one.
stu 29 high light process 004 by singlespeedstu, on Flickr
stu 29 high light process 016 by singlespeedstu, on Flickr
stu 29 high light stops 004 by singlespeedstu, on Flickr
stu_29_high_lightfinal_007 by singlespeedstu, on Flickr