STM towers is having a make over .
Works to include a new bathroom . The pink tiles and avocado suite just wernt coming back into fashion fast enough . Just like Halleys comet , they will be back again, unfortunatly not in my lifetime.
I have removed 90% of the glourious pink tiles and had room skimmed .
Chased out wall for concealed pipework
Worked out how to mount pipes in stupid 2″ cinder blocks ( front plate and 18mm ply with lots of pipe clamps .- tiled over
I have purchaed and assembled a new toilet / Bath / towel rail etc
Got wall and floor tiles in ready to go , at this point I run out of skill and patience . I have no DIY ability , no tools and bicycles and the internet are waaaay more better than tiling.
So , I call in the professionals. Man ( boy ) in a van comes round and uses all the right words . Quote comes in at £2150 to tile 8sq M of wall 2 sqM of floor and supply grout, adhesive and ply . Then slide new bath in , slide new bog in and box away some pipework.
STM towers bog is 175 x 175 ( cm’s ) . Guess it might be time to teach force myself to learn how to tile and do some basic carpentry as that is a holiday , another bike and change