lets not start this again smudger! 😉
chappie turned up last night. Hes going to prepare a quote. He was receptive of how much I want to do myself, but equally there’s so little to do (Ive created a frame bed, connected by underground conduit to the boiler room and just a few feet to the TS already) that there’s not much to be paid for on the install.
Im most worried about the very hi-spec of pipe he uses (+£) and hes suggesting an all-in-one pumpstation for simplicity…but Im not sure its going to be as cost effective as specing check valves, blow off valves, controller and pump myself…will see when he comes in with the numbers.
He did say that min 15mm pipe and a 15-50 CH pump would be fine.
[off out for dinner tonight so will catch up with you later]