Hoping someone can help me with this.
I am a furniture maker by trade, I teach it to be exact, but now and again I do ‘bits and bobs’ on the side.
I have been asked to do a bigger than normal ‘bob’ and was hoping someone might be able to tell me if I’m on the right lines.
A bloke wants the cabinets making as shown below. He is going to provide all the materials, my job is literally just to make the cabinets.
All the carcasses are to be plywood or mdf, biscuit-jointed together.
He wants solid timber ‘lay-on’ frames with a pencil moulding and inset frame and panelled doors similar to the style shown below. These will all be painted (by his fitters)
The drawers are to be hung on Blum-style runners and the doors hung on brass butt hinges.
I have access to full machining facilities but can only do this inbetween my full-time daytime job.
So far, I have based my rate on £22.50 an hour and estimated around 41 hours to complete, bringing the cost to about £925.
Obviously that is a big amount of cash, but, it’s a big amount of time and hassle and late evenings.
He has had a presumably high quote from a couple of kitchen companies and this is I assume why he has approached me.
I really don’t normally do work like this, hence the request for help.
Does that figure sound mental to those in the know?
Any thoughts?
Cheers.
If it’s time only then maybe it’s OK but if it’s fixed cost build some fat/contingency in as you’ve every right to protect yourself on a fixed-price job. I know nowt about joinery and am assuming your time estimates are based on experience. Does seem like good value though.
Firstly that looks like a Clive Christian replica in the photo, I used to Sub contract for them, for a real “Christians” version of what he wants you’d be talking a minimum £15000 fitted and painted, he’s obviously trying to get it cheaper but I wouldn’t do it for any less than £1500 to be honest, especially if your doing a finger jointed oak work top.
You may be doing it in between your day job but that’s not the point, your making bespoke furniture and that doesn’t come cheep!
supply of a similar kitchen at b+q or ikea would be 2000 shirley? that would be painted tho and include worktops…but it is handmade… swings and roundabouts innit. one thing tho, if you teach it you will know that everything always takes twice as long as you think, £900 for 80 hours work? let us know how you get on, eh?
Pretty cheap also what about your workshop costs etc.
Looks like your trying to copy a Christian kitchen too.
with out being rude I have no idea of the quality of your workmanship
but your quote is very cheap indeed.
I have my own Bespoke furniture company so your about £ 1,500 out of pocket
and will take you longer than time you have quoted
My workshop costs are sort of non-existent. I work in a college and they allow me to do some of my own stuff in the evenings so long as I don’t take the mick(this may be taking the mick a bit 😀 )
Not sure if he is copying anything. That’s quite a common style I believe. Those are just one of several ‘style’ shots he sent me for ideas as to what he’s after.
Quality of my work is excellent, to blow my own trumpet. Degree level in furniture design/craftsmanship along with many years experience making one-off ‘fine furniture’.
Yeah I think you’re right about it taking me longer than I’ve said. I really need the money to be honest and so need the job, but it’s very difficult to know if you’re pitching too low/high when you have no experience of that sector…
Not sure if he is copying anything. That’s quite a common style I believe. Those are just one of several ‘style’ shots he sent me for ideas as to what he’s after.
Believe me it is, the breakfront detail on the work top is one followed by the moulded edge
and then you have the Corbel decoration on the right hand side.
[A Christian Kitchen will be roughly the same price as an Smallbone or Mark Wilkinson
Yeah I think you’re right about it taking me longer than I’ve said. I really need the money to be honest and so need the job, but it’s very difficult to know if you’re pitching too low/high when you have no experience of that sector…
Not knocking you but only answering your question, and also knowing what the guy is try to achieve for very little outlay. So i rather you get the monies you deserve for your skill rate/craftsmanship.
Believe me it is, the breakfront detail on the work top is one followed by the moulded edge
and then you have the Corbel decoration on the right hand side.
Yeah, he doesn’t want an exact copy, just giving me an idea of the sort of quality he is after more like. None of those fancy-schmancy supports for instance. I did once have a job making similar kitchens in about 1997 but it’s that long ago I’ve kind of forgotten whats involved…
Not many cabinets there,yes should easily be made in 40 (1) hrs mate…yes id be happy to make for about 1k cash….nice 1…. private jobs help wit bike upgrades eh!!! :)…. do it!
So far, I have based my rate on £22.50 an hour and estimated around 41 hours to complete, bringing the cost to about £925.
Obviously that is a big amount of cash, but, it’s a big amount of time and hassle and late evenings.
Its not a big amount of cash in bespoke kitchen terms, in fact the chap I got some granite from said he’d just supplied a piece only 300mm wide and joined it to an existing worktop. The 300mm unit had cost £1000!
But, if its only your time then its £1000 GROSS you’ll have. If you pay tax/NI and it takes you 20% longer, you’ll be working for about £10 per hour…
Knows that he`ll be getting a bargain so dont be afraid to pitch it up a bit. After all, hes asking you to it because he cant – dont sell yourself short son !!
As you are using someone else’s machinery, there’s no cost to you, but be careful. This is the sort of thing which cold raise eyebrows and you could end up in trouble. It’s your call to work out what the risk is on that.
In terms of time, double it and add 10% as we are all hopeless optimists. That’s what I always find when estimating jobs like this (done a lot of joinery work, both for myself and commercially).
Christians make nice fronts on bog standard chipboard carcasses. Well that’s what it looked like when I scrutinised their showroom examples.
I was set to build my own Christian copy kitchen as I’d got all the machinery and done the rest of the house, but mother in law butted in on the situation, saying her daughter should have a new kitchen installed before the arrival of our second child. As she was paying, I let them get on with it, but we ended up with £10500 worth of troublesome mediocre blandness. It’s now ready for the skip.
My bespoke job would have been vastly better and refinishing easy because hand painting is the accepted norm for top end kitchens like the one shown in Christians.
PS, tell your customer that he should use built in appliances so you can fit matching panels. If not, it will look really crxp with the white goods juxtaposition! He may as well buy cheap flatpack stuff if the appliances aren’t hidden.
As others have said, what you’re proposing to quote isn’t much when you’re talking about bespoke kitchens. And compared to the other costs he’ll have it will be small.
I’d quote £1,500 and then charge him £1,450. Make him feel he got a good deal.
far far too cheap, as most have said double that and you d be alright. 22.50 is 45 doubled up take from that the materials that you WILL have to purchase and add the time it will really take you to make.. running around etc etc will give you an honest 30ph
Please dont do great work ofr 22.50 cos 925 is NOT a lot of money
That is mighty cheap for what you are producing. I’d be wanting more and that is during normal hours. For the inconvenience of working evenings I’d be asking for a lot more…
Have you factored in time for laying out and planning, not just cutting, routing, etc?
Yeah tried to, but that’s the trouble. I’m fairly experienced making all sorts of stuff, but not so experienced in remembering how long it took me… 😳
I did try to factor in some marking out time etc, but it’s difficult.
The guy in his advert said that he had several projects like this to do(this one being a utility room in a posh house) but that he wasn’t all that pushed on time and so it might suit someone doing it as more of a hobby than an actual job.
In other words, he wants it cheaper…
I don’t want to put him off, but then obviously I am not doing myself or my peers any favours by underselling the skills which took me years and years to build up…
All seems very very cheap. I’ve had a lot of bespoke furniture made in my house and the cheapest item was a desk, without drawers, which was £750 (solid ash with inlaid ebony trim). Way, way simpler than a kitchen, but almost the same cost as your suggesting!
NB The guy who made it all isn’t rich by any means, bespoke furniture just takes a lot of time to make and fit.
Whatever price you decide to go with will be used as a base-line.
If hes good to his word and puts more work your way expect this project to be a guide to future pricing …. 😉
My BIL does similar work he said he would start at £1900 if it wasn’t his own workshop costs. You can always come down a bit. You know your works good so give your quote.
Re, not liking to ask for money: I’m the same but means must. From small stuff like £50 to £5k contracts I don’t like it but its just what has to be done.
Your hourly rate seems a bit low to me I would have thought £30 was more realistic. Also if he offers you more work will you still be able to use the college machinery going forward? I think you need to factor in a cost for this to protect yourself with future deals – say £80 per day (I don’t know what the actual effective rate should be if you had to take account the cost of the equipment/workshop you would need)