11m long 3.5m width, gable ends in brick with a slate roof, electric roller main door, couple of windows and a side door (Could fit used stuff, I’ve seen good UPVC stuff at the tip before which I’me sure would clean up fine to save a bit). I’ve got a mate who I can work with on the ground works and foundations but would need to get a brick layer and roofer in.
Anybody any opinions on if that’s ball park do-able?
I’ll eventually add a couple of stud walls and internally insulate for a little home off in the end and kit storage room but I’m just wondering if it’s doable to get the shell up first for about £10k.
I know I’ll need to go via planning and building regs for it