In my opinion the best thing to do is to is:
1- buy a roll of self amalgamating tape and, after removing the heatshrink, cover copiously in accordance with instructions.(see point 3 and the ingress of water)
2- Buy a battery charger from a model aircraft supplier(or similar) capable of charging LiFe batteries and having a storage charging program to enable @50% max charge.
3- be prepare to remove the shabby “protection” circuitry clagged to one end as this is the weak link in the whole setup. (see point 1)
Caveat being I am no lighting expert.