Viewing 4 posts - 1 through 4 (of 4 total)
  • Chester and Connah's Quay commuters and cyclists. Some info for you.
  • tthew
    Full Member

    There’s going to be a closure/diversion of the river path in the Shotton railway bridge and blue bridge stretch for 9 months. Starts next week.

    http://www.deeside.com/all-news/river-dee-path-closure-essential-flood-defence-work-carried/

    Would’ve been more useful on the other bank, where it keeps flooding. 😡

    chunkypaul
    Free Member

    ty

    tthew
    Full Member

    Evening bump, ‘cos you were probably all at work when I originally posted!

    Russell96
    Full Member

    The signs have been up for a while, apart from the diversion there’s always the track from RAF Sealand down to river to use as a diversion anyway.

    The other bank is fecked, the flooding is coming up beneath the banks, I’ve seen mini fountains of water spouting up on the other side of the track from the walls at the really high tides, so theres a path or few deep down that need sorting too.