• This topic has 15 replies, 8 voices, and was last updated 15 years ago by st.
Viewing 16 posts - 1 through 16 (of 16 total)
  • CHASETRAILS NEED YOU THIS SUNDAY!
  • postierich
    Free Member

    Chase Trail Building News

    :http://www.chasetrails.co.uk/trailbuild.php

    Cross Country trail building;

    Sunday 1st March – Big Build Day (Phase 2). Barbeque and prize draw for all volunteers.

    Be a part of our newest and most exciting trail so far. It’s only with your help that we’ll be able to get phase 2 ready and opened in 2009 so park up the bike for a day and pick up a shovel. Whilst we can provide tools we’re expecting a big turn out so bring you own spade, pick or strudy rake.

    We’ll be meeting at Swinnerton Cycles Forest Centre at 9.45am and will be leaving for the work site at 10am prompt.

    Working over on the Special Events area near the Monkey Trail so if you fancy a spin around afterwards I,m up for a guided ride around the area.

    Rich

    scruff
    Free Member

    Royal we?

    rOcKeTdOg
    Full Member

    cool i’ll be at the Wyre while everyone’s over there digging

    neilb67
    Free Member

    Looks like CT have got a new PR man…..

    postierich
    Free Member

    Nursing a poorly child with nowt else to do. 🙂

    More the merrier!

    scruff
    Free Member

    Dels promised high quaility burgers.

    neilb67
    Free Member

    Got the stuff to test ya battery mate.. 😀
    I heard it was a curry and pasta… 🙂

    postierich
    Free Member

    Just a heads up for anyone wanting to be a trail fairy for the day!

    postierich
    Free Member

    Another large turnout and great weather with loads of raffle prizes, two tickets two winners thats karma that!


    Go on then I will have another!

    Finally a paid up member of Chase Trails!

    walleater
    Full Member

    Snakebart iz sukcing scrufFs c0kc!!1!!11!!!1

    scruff
    Free Member

    Thanks William.

    postierich
    Free Member

    Very good Walleater worth a bump!

    snakebite
    Free Member

    Dare I mention that there was cheese on the hotdog….

    I_Ache
    Free Member

    I take it this was work being done on the new trail? Any idea when its due for completion?

    neilb67
    Free Member

    Still a lot to do on Phase 2 I believe. But there was a load of work done yesterday and a few more build days should bring it ever nearer

    st
    Full Member

    Cheers Rich, missed this thread.

    Cheers to anyone off here who turend up, we had 80 volunteers in the end. A bunch of (free) raffle sprizes and free bbq as a thanks to those who gave up a few hours to help.

    There’s still a long way to go. If all goes to plan we should have the trail opened by late Summer / early Autumn.

    Next big build day is tba but possibly around easter. There’ll be more goodies to give away and a whole new section of trail to build from scratch.

Viewing 16 posts - 1 through 16 (of 16 total)

The topic ‘CHASETRAILS NEED YOU THIS SUNDAY!’ is closed to new replies.