Argh! Spent until 1am this morning servicing my 2 dropper posts:
1) KS lev, done in 20 minutes (although there’s a ‘gas strut’ affair in there like on your car boot which isn’t user serviceable). Action is now ok although a bit jerky for some reason.
2) Reverb, took hours of faffing, reassembled it 3 times, used about 750ml of oil because of this (mostly squirted/dripped over the floor of the garage) and generally was a complete arse of a job that I know I’ll have to repeat one day. I love the action of the thing, the 125mm drop with really smooth motion but it’s an absolute PITA to keep running.
I also have a mechanical T-Mars type post, which despite being abused for months by my maintenance-phobic son still takes 5 minutes and a spot of oil to get it working again.
I’m going with a mechanical operation post next time…..